Eeklo windfarm (Belgium)
[Back to previous page]
Generalities
- Wind farm name: Eeklo
- Country: Belgium
- County / Zone: Oost-Vlaanderen
- Total installed power: 10.6 MW
- Estimated annual production: 26 GW.h (for an equivalent of 2500 hours of full load/year)
Details
Part #1:
- City: Eeklo (Ringlaan)
- Commissioning: 2001
- 2 turbine(s) Enercon E66/1800 (power 1800 kW, diameter 66 m)
- Hub height: 86 m
- Total nominal power: 3600 kW
- Operational
- Onshore wind farm
Part #2:
- 2 turbine(s) Enercon E82/2300 (power 2300 kW, diameter 82 m)
- Total nominal power: 4600 kW
- Under construction
- Onshore wind farm
- Developed by: Ecopower
Part #3:
- Part: Honderdbundermolen
- City: Eeklo
- Commissioning: 2002
- 1 turbine(s) Enercon E40/600 (power 600 kW, diameter 40 m)
- Hub height: 65 m
- Total nominal power: 600 kW
- Operational
- Onshore wind farm
- Operator: Ecopower
Part #4:
- Part: Transeeklo
- City: Eeklo
- Commissioning: 2002/12
- 1 turbine(s) Enercon E66/1800 (power 1800 kW, diameter 66 m)
- Hub height: 86 m
- Total nominal power: 1800 kW
- Operational
- Onshore wind farm
- Developed by: Electrawinds
- Operator: Electrawinds
Update for this sheet: 07/2011