A Capelada II windfarm (Spain)
[Back to previous page]
Generalities
- Wind farm name: A Capelada II
- Country: Spain
- County / Zone: Galicia
- Total installed power: 14.85 MW
- Estimated annual production: 37 GW.h (for an equivalent of 2500 hours of full load/year)
Details
- City: Cariņo, Cedeira, Ortigueira
- Commissioning: 1997
- 45 turbine(s) Made AE-30 (power 330 kW, diameter 30 m)
- Total nominal power: 14850 kW
- Operational
- Onshore wind farm
- Operator: P. Eolico A Capelada AIE
Update for this sheet: 12/2011
Complete/correct this sheet: contact page