El Redondal Fase 2 windfarm, Spain
[Back to previous page]
Generalities
Wind turbines
Part 1 : - City : Castropodame y Turienzo Castañero
- 5 turbine(s) Gamesa G52/850 (puissance de 850 kW, diamètre de 52 m)
- Total power : 4250 kW
- Total wings surface : 10620 m²
Part 2 : - City : Castropodame y Turienzo Castañero
- 14 turbine(s) Gamesa G58/850 (puissance de 850 kW, diamètre de 58 m)
- Total power : 11900 kW
- Total wings surface : 29736 m²
Installed power and production capacity
- Total installed power : 16.15 MW
- Yearly estimated production (see below) : 37 GW.h
- Supplied population by this windfamr (estimation, see below) : 14800 habitants
- Computation hypothesis : private consumption including home heating