Ciesma de Grisel + Ampliación Grisel windfarm (Spain)
[Back to previous page]
Generalities
- Wind farm name: Ciesma de Grisel + Ampliación Grisel
- Country: Spain
- County / Zone: Aragón
- Total installed power: 13.5 MW
- Estimated annual production: 33 GW.h (for an equivalent of 2500 hours of full load/year)
Details
- City: Grisel
- 18 turbine(s) Vestas NM48 (power 750 kW, diameter 48 m)
- Total nominal power: 13500 kW
- Operational
- Onshore wind farm
- Operator: P. Eolico Grisel
Update for this sheet: 02/2011
Complete/correct this sheet: contact page