Mairos I windfarm (Portugal)
[Back to previous page]
Generalities
- Wind farm name: Mairos I
- Country: Portugal
- County / Zone: Vila Real
- Total installed power: 2.6 MW
- Estimated annual production: 6 GW.h (for an equivalent of 2500 hours of full load/year)
Details
Part #1:
- Commissioning: 2006
- 1 turbine(s) Enercon E48/600 (power 600 kW, diameter 48 m)
- Total nominal power: 600 kW
- Operational
- Onshore wind farm
- Owner: Safe 4 fire
Part #2:
- Commissioning: 2006
- 1 turbine(s) Enercon E70/E4 (power 2000 kW, diameter 70 m)
- Total nominal power: 2000 kW
- Operational
- Onshore wind farm
- Owner: Safe 4 fire
Update for this sheet: 04/2011
Complete/correct this sheet: contact page