Lestrade windfarm, France
[Back to previous page]
Generalities
Wind turbines
- City : Lestrade-et-Thouels
- Installation : 2008/02
- 5 turbine(s) Enercon (turbine model not available)
- Total power : 11500 kW
Installed power and production capacity
- Total installed power : 11.5 MW
- Yearly estimated production (see below) : 25 GW.h
- Supplied population by this windfamr (estimation, see below) : 10300 habitants
- Computation hypothesis : private consumption including home heating