- Wind farm name: Mont Copper
- Country: Canada
- County / Zone: Québec
- Total installed power: 54 MW
- Estimated annual production: 135 GW.h (for an equivalent of 2500 hours of full load/year)
Details
Part #1:
- Part: Phase I
- Commissioning: 2004/05
- 5 turbine(s) Vestas V80/1800 (power 1800 kW, diameter 80 m)
- Total nominal power: 9000 kW
- Operational
- Onshore wind farm
- Operator: FPL Energy
Part #2:
- Part: Phase II
- Commissioning: 2005/06
- 25 turbine(s) Vestas V80/1800 (power 1800 kW, diameter 80 m)
- Total nominal power: 45000 kW
- Operational
- Onshore wind farm
- Operator: FPL Energy
Update for this sheet: 11/2011