Aeroman repower (2003) windfarm (USA)
[Back to previous page]
Generalities
- Wind farm name: Aeroman repower (2003)
- Country: USA
- County / Zone: California
- Total installed power: 3 MW
- Estimated annual production: 7 GW.h (for an equivalent of 2500 hours of full load/year)
Details
- City: Tehachapi
- Commissioning: 2003
- 2 turbine(s) GE (model not available)
- Total nominal power: 3000 kW
- Operational
- Onshore wind farm
- Developed by: Coram Energy
- Operator: Coram Energy
- Owner: Coram Energy
Update for this sheet: 12/2011
Complete/correct this sheet: contact page