Victory Gardens, Phase IV windfarm, USA
[Back to previous page]
Generalities
Wind turbines
Part 1 : - City : Tehachapi
- Installation : 1990
- 94 turbine(s) Vestas (turbine model not available)
- Total power : 21150 kW
Part 2 : - City : Tehachapi
- Installation : 1990
- 2 turbine(s) Vestas (turbine model not available)
- Total power : 1320 kW
Installed power and production capacity
- Total installed power : 22.47 MW
- Yearly estimated production (see below) : 51 GW.h
- Supplied population by this windfamr (estimation, see below) : 20600 habitants
- Computation hypothesis : private consumption including home heating