Cedar Creek windfarm, USA
[Back to previous page]
Generalities
Wind turbines
Part 1 : - City : Weld County
- 221 turbine(s) Mitsubishi (turbine model not available)
- Total power : 221000 kW
Part 2 : - City : Weld County
- 53 turbine(s) GE (turbine model not available)
- Total power : 79500 kW
Installed power and production capacity
- Total installed power : 300.5 MW
- Yearly estimated production (see below) : 691 GW.h
- Supplied population by this windfamr (estimation, see below) : 276400 habitants
- Computation hypothesis : private consumption including home heating