Intrepid windfarm, USA
[Back to previous page]
Generalities
Wind turbines
- City : Buena Vista and Sac Counties
- 107 turbine(s) GE (turbine model not available)
- Total power : 160500 kW
Installed power and production capacity
- Total installed power : 160.5 MW
- Yearly estimated production (see below) : 369 GW.h
- Supplied population by this windfamr (estimation, see below) : 147600 habitants
- Computation hypothesis : private consumption including home heating