Horse Hollow III windfarm, USA
[Back to previous page]
Generalities
Wind turbines
- City : Taylor County
- Installation : 2006
- 149 turbine(s) GE (turbine model not available)
- Total power : 223500 kW
Installed power and production capacity
- Total installed power : 223.5 MW
- Yearly estimated production (see below) : 514 GW.h
- Supplied population by this windfamr (estimation, see below) : 205600 habitants
- Computation hypothesis : private consumption including home heating