Buffalo Gap II windfarm, USA
[Back to previous page]
Generalities
- Wind farm name : Buffalo Gap II
- Country : USA
- Zone : Texas
- Developed by : AES Corp.
Wind turbines
- City : Taylor County
- 155 turbine(s) GE (turbine model not available)
- Total power : 232500 kW
Installed power and production capacity
- Total installed power : 232.5 MW
- Yearly estimated production (see below) : 534 GW.h
- Supplied population by this windfamr (estimation, see below) : 213900 habitants
- Computation hypothesis : private consumption including home heating