Buffalo Gap 3 windfarm (USA)
[Back to previous page]
Generalities
- Wind farm name: Buffalo Gap 3
- Country: USA
- County / Zone: Texas
- Total installed power: 170.2 MW
- Estimated annual production: 425 GW.h (for an equivalent of 2500 hours of full load/year)
Details
- City: Taylor County
- Commissioning: 2008
- 74 turbine(s) Siemens SWT-2.3-93 (power 2300 kW, diameter 93 m)
- Total nominal power: 170200 kW
- Operational
- Onshore wind farm
- Developed by: AES
- Operator: AES
- Owner: AES Wind Generation
Update for this sheet: 09/2011
Complete/correct this sheet: contact page