Avignonet windfarm, France
[Back to previous page]
Generalities
Wind turbines
Part 1 : - City : Avignonet
- Installation : 2002/11
- 10 turbine(s) Nordex N50/800 (puissance de 800 kW, diamètre de 50 m)
- Total power : 8000 kW
- Total wings surface : 19637 m²
Part 2 : - City : Avignonet
- Installation : 2008
- 2 turbine(s) Enercon E70/2000 (puissance de 2000 kW, diamètre de 70 m)
- Total power : 4000 kW
- Total wings surface : 7696 m²
Installed power and production capacity
- Total installed power : 12 MW
- Yearly estimated production (see below) : 27 GW.h
- Supplied population by this windfamr (estimation, see below) : 10800 habitants
- Computation hypothesis : private consumption including home heating