Fitou II windfarm (France)
[Back to previous page]
Generalities
- Wind farm name: Fitou II
- Country: France
- County / Zone: 11
- Total installed power: 11.7 MW
- Estimated annual production: 29 GW.h (for an equivalent of 2500 hours of full load/year)
Details
Part #1:
- City: Fitou
- Commissioning: 2006/05
- 8 turbine(s) Nordex N60/1300 (power 1300 kW, diameter 60 m)
- Hub height: 80 m
- Total nominal power: 10400 kW
- Operational
- Onshore wind farm
- Developed by: Enerpole
- Operator: Iberdrola
- Owner: Iberdrola Renewables
Part #2:
- Part: Extension
- City: Fitou
- Commissioning: 2007/10
- 1 turbine(s) Nordex N60/1300 (power 1300 kW, diameter 60 m)
- Hub height: 80 m
- Total nominal power: 1300 kW
- Operational
- Onshore wind farm
- Developed by: Enerpole
- Operator: Iberdrola
- Owner: Iberdrola Renewables
Update for this sheet: 08/2011
Complete/correct this sheet: contact page