Lijingzi-1 windfarm (China)
[Back to previous page]
Generalities
- Wind farm name: Lijingzi-1
- Country: China
- County / Zone: Gansu
- Total installed power: 110 MW
- Estimated annual production: 275 GW.h (for an equivalent of 2500 hours of full load/year)
Details
Part #1:
- City: Yumen
- Commissioning: 1997/06
- 4 turbine(s) Nordtank NTK300/31 (power 300 kW, diameter 31 m)
- Total nominal power: 1200 kW
- Operational
- Onshore wind farm
- Developed by: LongYuan
Part #2:
- City: Yumen
- Commissioning: 2001/03
- 12 turbine(s) Gamesa G42/600 (power 600 kW, diameter 42 m)
- Total nominal power: 7200 kW
- Operational
- Onshore wind farm
- Developed by: LongYuan
Part #3:
- City: Yumen
- Commissioning: 2002/12
- 13 turbine(s) Goldwind S43/600 (power 600 kW, diameter 43 m)
- Total nominal power: 7800 kW
- Operational
- Onshore wind farm
- Developed by: LongYuan
Part #4:
- City: Yumen
- Commissioning: 2003/08
- 9 turbine(s) Goldwind S43/600 (power 600 kW, diameter 43 m)
- Total nominal power: 5400 kW
- Operational
- Onshore wind farm
- Developed by: LongYuan
Part #5:
- City: Yumen
- Commissioning: 2004/09
- 36 turbine(s) Gamesa G58/850 (power 850 kW, diameter 58 m)
- Total nominal power: 30600 kW
- Operational
- Onshore wind farm
- Developed by: LongYuan
Part #6:
- City: Yumen
- Commissioning: 2006/10
- 14 turbine(s) Gamesa G52/850 (power 850 kW, diameter 52 m)
- Total nominal power: 11900 kW
- Operational
- Onshore wind farm
- Developed by: LongYuan
Part #7:
- City: Yumen
- Commissioning: 2006/12
- 16 turbine(s) Gamesa G58/850 (power 850 kW, diameter 58 m)
- Total nominal power: 13600 kW
- Operational
- Onshore wind farm
- Developed by: LongYuan
Part #8:
- City: Yumen
- Commissioning: 2007/03
- 38 turbine(s) Gamesa G58/850 (power 850 kW, diameter 58 m)
- Total nominal power: 32300 kW
- Operational
- Onshore wind farm
- Developed by: LongYuan
Update for this sheet: 12/2011
Complete/correct this sheet: contact page