Ahaus windfarm (Germany)
[Back to previous page]
Generalities
- Wind farm name: Ahaus
- Country: Germany
- County / Zone: Nordrhein-Westfalen
- Total installed power: 9.315 MW
- Estimated annual production: 23 GW.h (for an equivalent of 2500 hours of full load/year)
Details
Part #1:
- City: Ahaus
- Commissioning: 2004/05
- 1 turbine(s) (manufacturer name not available) (model not available)
- Total nominal power: 2000 kW
- Operational
- Onshore wind farm
Part #2:
- City: Ahaus
- 1 turbine(s) (manufacturer name not available) (model not available)
- Total nominal power: 55 kW
- Operational
- Onshore wind farm
Part #3:
- City: Ahaus
- 2 turbine(s) (manufacturer name not available) (model not available)
- Total nominal power: 160 kW
- Operational
- Onshore wind farm
Part #4:
- City: Ahaus
- Commissioning: 1998
- 2 turbine(s) (manufacturer name not available) (model not available)
- Total nominal power: 1200 kW
- Operational
- Onshore wind farm
Part #5:
- City: Ahaus
- Commissioning: 1995/06
- 2 turbine(s) (manufacturer name not available) (model not available)
- Total nominal power: 1000 kW
- Operational
- Onshore wind farm
Part #6:
- City: Ahaus
- 2 turbine(s) (manufacturer name not available) (model not available)
- Total nominal power: 400 kW
- Operational
- Onshore wind farm
Part #7:
- City: Ahaus
- Commissioning: 2003
- 4 turbine(s) Enercon E58/1000 (power 1000 kW, diameter 58 m)
- Total nominal power: 4000 kW
- Operational
- Onshore wind farm
Part #8:
- City: Ahaus
- 2 turbine(s) (manufacturer name not available) (model not available)
- Total nominal power: 500 kW
- Operational
- Onshore wind farm
Update for this sheet: 01/2011
Complete/correct this sheet: contact page