Aderstedt windfarm (Germany)
[Back to previous page]
Generalities
- Wind farm name: Aderstedt
- Country: Germany
- County / Zone: Niedersachsen
- Total installed power: 5.6 MW
- Estimated annual production: 14 GW.h (for an equivalent of 2500 hours of full load/year)
Details
Part #1:
- City: Aderstedt
- Commissioning: 2001
- 2 turbine(s) (manufacturer name not available) (model not available)
- Total nominal power: 1000 kW
- Operational
- Onshore wind farm
Part #2:
- City: Aderstedt
- Commissioning: 2009
- 2 turbine(s) (manufacturer name not available) (model not available)
- Total nominal power: 4600 kW
- Operational
- Onshore wind farm
Update for this sheet: 01/2011
Complete/correct this sheet: contact page