Oster Lem windfarm (Denmark)
[Back to previous page]
Generalities
- Wind farm name: Oster Lem
- Country: Denmark
- Total installed power: 3.95 MW
- Estimated annual production: 9 GW.h (for an equivalent of 2500 hours of full load/year)
Details
Part #1:
- Commissioning: 2002/12
- 2 turbine(s) Vestas V66/1750 (power 1750 kW, diameter 66 m)
- Total nominal power: 3500 kW
- Operational
- Onshore wind farm
Part #2:
- Commissioning: 1993/08
- 1 turbine(s) Vestas V27/225 (power 225 kW, diameter 27 m)
- Hub height: 31.5 m
- Total nominal power: 225 kW
- Operational
- Onshore wind farm
Part #3:
- Commissioning: 1996/10
- 1 turbine(s) Vestas V29/225 (power 225 kW, diameter 29 m)
- Hub height: 31.5 m
- Total nominal power: 225 kW
- Operational
- Onshore wind farm