Brondum windfarm (Denmark)
[Back to previous page]
Generalities
- Wind farm name: Brondum
- Country: Denmark
- Total installed power: 8.15 MW
- Estimated annual production: 20 GW.h (for an equivalent of 2500 hours of full load/year)
Details
Part #1:
- Commissioning: 1997/11
- 1 turbine(s) Bonus B54/1000 (power 1000 kW, diameter 54.1 m)
- Hub height: 45 m
- Total nominal power: 1000 kW
- Operational
- Onshore wind farm
Part #2:
- Commissioning: 1998
- 5 turbine(s) Bonus B54/1000 (power 1000 kW, diameter 54.1 m)
- Hub height: 45 m
- Total nominal power: 5000 kW
- Operational
- Onshore wind farm
Part #3:
- Commissioning: 1998/09
- 1 turbine(s) Vestas V44/600 (power 600 kW, diameter 44 m)
- Hub height: 40 m
- Total nominal power: 600 kW
- Operational
- Onshore wind farm
Part #4:
- Commissioning: 1996/04
- 2 turbine(s) Vestas V39/500 (power 500 kW, diameter 39 m)
- Hub height: 45 m
- Total nominal power: 1000 kW
- Operational
- Onshore wind farm
Part #5:
- Commissioning: 1996/11
- 1 turbine(s) Neg Micon M750-400/100 (power 400 kW, diameter 31 m)
- Hub height: 35 m
- Total nominal power: 400 kW
- Operational
- Onshore wind farm
Part #6:
- Commissioning: 1990/05
- 1 turbine(s) Wind World W150/23 (power 150 kW, diameter 23 m)
- Hub height: 31 m
- Total nominal power: 150 kW
- Operational
- Onshore wind farm