Bostrup windfarm (Denmark)
[Back to previous page]
Generalities
- Wind farm name: Bostrup
- Country: Denmark
- Total installed power: 4.5 MW
- Estimated annual production: 11 GW.h (for an equivalent of 2500 hours of full load/year)
Details
Part #1:
- Commissioning: 2002/12
- 2 turbine(s) Neg Micon NM52/900 (power 900 kW, diameter 52 m)
- Hub height: 49 m
- Total nominal power: 1800 kW
- Operational
- Onshore wind farm
Part #2:
- Commissioning: 2000/08
- 3 turbine(s) Neg Micon NM48/750 (power 750 kW, diameter 48 m)
- Hub height: 46.3 m
- Total nominal power: 2250 kW
- Operational
- Onshore wind farm
Part #3:
- Commissioning: 1993/03
- 1 turbine(s) Vestas V27/225 (power 225 kW, diameter 27 m)
- Hub height: 30 m
- Total nominal power: 225 kW
- Operational
- Onshore wind farm
Part #4:
- Commissioning: 1993/09
- 1 turbine(s) Vestas V27/225 (power 225 kW, diameter 27 m)
- Hub height: 30 m
- Total nominal power: 225 kW
- Operational
- Onshore wind farm