Generalities
- Wind farm name: Dejbjerg
- Country: Denmark
- Total installed power: 7.875 MW
- Estimated annual production: 19 GW.h (for an equivalent of 2500 hours of full load/year)
Details
Part #1:
- Commissioning: 1996/10
- 2 turbine(s) Vestas V29/225 (power 225 kW, diameter 29 m)
- Hub height: 31.5 m
- Total nominal power: 450 kW
- Operational
- Onshore wind farm
Part #2:
- Commissioning: 1997/09
- 20 turbine(s) Vestas V29/225 (power 225 kW, diameter 29 m)
- Hub height: 31 m
- Total nominal power: 4500 kW
- Operational
- Onshore wind farm
Part #3:
- Commissioning: 1996/10
- 1 turbine(s) Vestas V29/225 (power 225 kW, diameter 29 m)
- Hub height: 31.5 m
- Total nominal power: 225 kW
- Operational
- Onshore wind farm
Part #4:
- Commissioning: 1997/09
- 9 turbine(s) Vestas V29/225 (power 225 kW, diameter 29 m)
- Hub height: 31 m
- Total nominal power: 2025 kW
- Operational
- Onshore wind farm
Part #5:
- Commissioning: 1997/11
- 1 turbine(s) Vestas V29/225 (power 225 kW, diameter 29 m)
- Hub height: 29.6 m
- Total nominal power: 225 kW
- Operational
- Onshore wind farm
Part #6:
- Commissioning: 1996/10
- 1 turbine(s) Vestas V29/225 (power 225 kW, diameter 29 m)
- Hub height: 31.5 m
- Total nominal power: 225 kW
- Operational
- Onshore wind farm
Part #7:
- Commissioning: 1997/09
- 1 turbine(s) Vestas V29/225 (power 225 kW, diameter 29 m)
- Hub height: 27.8 m
- Total nominal power: 225 kW
- Operational
- Onshore wind farm