Avernako windfarm (Denmark)
[Back to previous page]
Generalities
- Wind farm name: Avernako
- Country: Denmark
- Total installed power: 0.2 MW
- Estimated annual production: 0 GW.h (for an equivalent of 2500 hours of full load/year)
Details
- Commissioning: 1995/07
- 1 turbine(s) Vestas V29/225 (power 225 kW, diameter 29 m)
- Hub height: 30 m
- Total nominal power: 200 kW
- Operational
- Onshore wind farm