Silver Sage windfarm (USA)
[Back to previous page]
Generalities
- Wind farm name: Silver Sage
- Country: USA
- County / Zone: Wyoming
- Total power: 42 MW
- Estimated annual production: 105 GW.h (for an equivalent of 2,500 hours of full load/year)
Details
- Commissioning: 2009
- 20 turbine(s) Suzlon S88/2100 (power 2100 kW, diameter 88 m)
- Total nominal power: 42,000 kW
- Operational
- Onshore wind farm
- Developed by: Duke Energy
- Owner: Duke Energy
Update for this sheet: 05/2011
Complete/correct this sheet: contact page