Freiamt windfarm (Germany)
[Back to previous page]
Generalities
- Wind farm name: Freiamt
- Country: Germany
- County / Zone: Baden-Württemberg
- Total power: 5 MW
- Estimated annual production: 13 GW.h (for an equivalent of 2,500 hours of full load/year)
Details
- Commissioning: 2001
- 3 turbine(s) Enercon E66/1800 (power 1800 kW, diameter 66 m)
- Hub height: 80 m
- Total nominal power: 5,400 kW
- Operational
- Onshore wind farm
- Developed by: ABO-Wind
Update for this sheet: 04/2012
Complete/correct this sheet: contact page