Düren windfarm (Germany)
[Back to previous page]
Generalities
- Wind farm name: Düren
- Country: Germany
- County / Zone: Nordrhein-Westfalen
- Total power: 11 MW
- Estimated annual production: 27 GW.h (for an equivalent of 2,500 hours of full load/year)
Details
Part #1:
- City: Düren
- Commissioning: 2001
- 6 turbine(s) Enron 1.5sl (power 1500 kW, diameter 77 m)
- Hub height: 80 m
- Total nominal power: 9,000 kW
- Operational
- Onshore wind farm
- Developed by: BMR
- Operator: BMR
Part #2:
- City: Düren
- Commissioning: 2008
- 1 turbine(s) Repower MM82 (power 2000 kW, diameter 82 m)
- Hub height: 80 m
- Total nominal power: 2,000 kW
- Operational
- Onshore wind farm
Update for this sheet: 10/2012