Cuxhaven windfarm (Germany)
[Back to previous page]
Generalities
- Wind farm name: Cuxhaven
- Country: Germany
- County / Zone: Niedersachsen
- Total power: 37 MW
- Estimated annual production: 92 GW.h (for an equivalent of 2,500 hours of full load/year)
Details
Part #1:
Part #2:
- City: Cuxhaven
- Commissioning: 2006
- 1 turbine(s) Repower 5M (power 5000 kW, diameter 126 m)
- Hub height: 117 m
- Total nominal power: 5,000 kW
- Operational
- Onshore wind farm
- Developed by: REpower
- Operator: EWE AG
Part #3:
- City: Cuxhaven
- Commissioning: 2006
- 1 turbine(s) Repower 5M (power 5000 kW, diameter 126 m)
- Hub height: 117 m
- Total nominal power: 5,000 kW
- Operational
- Onshore wind farm
- Developed by: REpower
- Operator: RWE
- Owner: EWC Windpark Cuxhaven GmbH
Part #4:
- City: Cuxhaven
- Commissioning: 2001
- 16 turbine(s) (manufacturer name not available)
- Total nominal power: 20,800 kW
- Operational
- Onshore wind farm
Part #5:
- City: Cuxhaven
- Commissioning: 1994/06
- 1 turbine(s) (manufacturer name not available)
- Total nominal power: 450 kW
- Operational
- Onshore wind farm
Part #6:
- City: Cuxhaven
- Commissioning: 1999/09
- 1 turbine(s) (manufacturer name not available)
- Total nominal power: 1,000 kW
- Operational
- Onshore wind farm
Part #7:
- City: Cuxhaven
- Commissioning: 2008/12
- 1 turbine(s) (manufacturer name not available)
- Total nominal power: 1,300 kW
- Operational
- Onshore wind farm
Part #8:
- City: Cuxhaven
- Commissioning: 1996/07
- 1 turbine(s) (manufacturer name not available)
- Total nominal power: 600 kW
- Operational
- Onshore wind farm
Part #9:
- City: Cuxhaven
- Commissioning: 1991
- 1 turbine(s) (manufacturer name not available)
- Total nominal power: 150 kW
- Operational
- Onshore wind farm
Update for this sheet: 06/2013
Complete/correct this sheet: contact page