Wind power and windfarms database

English English Deutsch Espa˝ol

Online access > Wind farms > Borghorst Laer (Germany)


[Back to previous page]

Generalities

PDF

Details


Part #1:

  • Commissioning: 2009
  • 1 turbine: Enercon E70/2000 (power 2 000 kW, diameter 70 m)
  • Total nominal power: 2,000 kW
  • Operational
  • Onshore wind farm
  • Developer: WPD

       Production forecast

  • From Friday, February 24 2017, 01:00 UTC, for the coming 24 hours:
  • Expected load rate: 50.4 %
  • Expected production: 24,170 kWh
  • Values from Climpact-Metnext Windcaster solution

Part #2:

  • Commissioning: 2009
  • 1 turbine: Enercon E82/2000 (power 2 000 kW, diameter 82 m)
  • Total nominal power: 2,000 kW
  • Operational
  • Onshore wind farm
  • Developer: WPD

       Production forecast

  • From Friday, February 24 2017, 01:00 UTC, for the coming 24 hours:
  • Expected load rate: 57.3 %
  • Expected production: 27,480 kWh
  • Values from Climpact-Metnext Windcaster solution

Localisation


Part #1:

  • Latitude: 52░ 7' 21.7"
  • Longitude: 7░ 23' 43"
  • Geodetic system: WGS84
  • Precise localization: no

Part #2:

  • Latitude: 52░ 7' 21.7"
  • Longitude: 7░ 23' 43"
  • Geodetic system: WGS84
  • Precise localization: no

Global map



Pictures


No photos for this wind farm.

Update for this sheet: 10/2016
Complete/correct this sheet:

Eoltech

www.thewindpower.net - 2005-2017 - all rights reserved - contact - partners - advertising