Bassum windfarm (Germany)
[Back to previous page]
Generalities
- Wind farm name: Bassum
- Country: Germany
- County / Zone: Niedersachsen
- Total power: 23 MW
- Estimated annual production: 56 GW.h (for an equivalent of 2,500 hours of full load/year)
Details
Part #1:
- Commissioning: 1991
- 1 turbine(s) (manufacturer name not available)
- Total nominal power: 55 kW
- Operational
- Onshore wind farm
Part #2:
- Commissioning: 1997/05
- 1 turbine(s) Enercon E40/500 (power 500 kW, diameter 40 m)
- Total nominal power: 500 kW
- Operational
- Onshore wind farm
Part #3:
- City: Hollwedel
- Commissioning: 2004/11
- 7 turbine(s) Vestas V80/2000 (power 2000 kW, diameter 80 m)
- Hub height: 78 m
- Total nominal power: 14,000 kW
- Operational
- Onshore wind farm
- Developed by: BHT
- Operator: BHT-Windpark
- Owner: BHT-Windpark
Part #4:
- Commissioning: 1994
- 2 turbine(s) Nordex N27/150 (power 150 kW, diameter 27 m)
- Total nominal power: 300 kW
- Operational
- Onshore wind farm
Part #5:
- Commissioning: 2002/10
- 1 turbine(s) (manufacturer name not available)
- Total nominal power: 850 kW
- Operational
- Onshore wind farm
Part #6:
- Commissioning: 1999/04
- 4 turbine(s) Nordex N60/1300 (power 1300 kW, diameter 60 m)
- Total nominal power: 5,200 kW
- Operational
- Onshore wind farm
Part #7:
- Commissioning: 1998/11
- 1 turbine(s) Nordtank NTK600/43 (power 600 kW, diameter 43 m)
- Total nominal power: 600 kW
- Operational
- Onshore wind farm
Part #8:
- Commissioning: 1996/05
- 2 turbine(s) Enercon E40/500 (power 500 kW, diameter 40 m)
- Total nominal power: 1,000 kW
- Operational
- Onshore wind farm
Update for this sheet: 01/2011