Wind power and windfarms database
Eoltech

English English Deutsch Espa˝ol


Eoltech

Online access > Wind farms > Bunde-Bunderhee (Germany)


[Back to previous page]

Generalities

PDF

Details


  • Commissioning: 2006
  • 9 turbines: Enercon E70/2300 (power 2 300 kW, diameter 71 m)
  • Hub height: 99 m
  • Total nominal power: 20,700 kW
  • Operational
  • Onshore wind farm
  • Developer: Enova
  • Operator: Enova
  • Owner: Enova

       Production forecast

  • From Wednesday, July 27 2016, 02:00 UTC, for the coming 24 hours:
  • Expected load rate: 8.9 %
  • Expected production: 44,400 kWh
  • Values from Climpact-Metnext Windcaster solution

Localisation


  • Latitude: 53░ 13' 7.4"
  • Longitude: 7░ 18' 2"
  • Geodetic system: WGS84
  • Precise localization: no

Global map




Pictures



No photos for this wind farm.

Update for this sheet: 04/2016
Complete/correct this sheet: