Generalities
- Wind farm name: Drochtersen
- Country: Germany
- County / Zone: Niedersachsen
- Total power: 18 MW
- Estimated annual production: 46 GW.h (for an equivalent of 2,500 hours of full load/year)
Details
Part #1:
- City: Drochtersen
- Commissioning: 2003
- 2 turbine(s) Neg Micon NM64/1500 (power 1500 kW, diameter 64 m)
- Total nominal power: 3,000 kW
- Operational
- Onshore wind farm
- Developed by: WPD
Part #2:
- City: Drochtersen
- Commissioning: 1995
- 7 turbine(s) Vestas
- Total nominal power: 4,200 kW
- Operational
- Onshore wind farm
Part #3:
- City: Drochtersen
- Commissioning: 1992/11
- 1 turbine(s) (manufacturer name not available)
- Total nominal power: 225 kW
- Operational
- Onshore wind farm
Part #4:
- City: Drochtersen
- 2 turbine(s) (manufacturer name not available)
- Total nominal power: 4,000 kW
- Operational
- Onshore wind farm
Part #5:
- City: Drochtersen
- Commissioning: 1997/04
- 2 turbine(s) (manufacturer name not available)
- Total nominal power: 1,000 kW
- Operational
- Onshore wind farm
Part #6:
- City: Drochtersen
- Commissioning: 2003/11
- 4 turbine(s) GE 1.5sl (power 1500 kW, diameter 77 m)
- Total nominal power: 6,000 kW
- Operational
- Onshore wind farm
- Developed by: Germania Windpark
Update for this sheet: 03/2011