Emstek windfarm (Germany)
[Back to previous page]
Generalities
- Wind farm name: Emstek
- Country: Germany
- County / Zone: Niedersachsen
- Total power: 40 MW
- Estimated annual production: 101 GW.h (for an equivalent of 2,500 hours of full load/year)
Details
Part #1:
- Commissioning: 2009
- 4 turbine(s) Enercon E82/2000 (power 2000 kW, diameter 82 m)
- Total nominal power: 8,000 kW
- Operational
- Onshore wind farm
Part #2:
- Commissioning: 1995/06
- 1 turbine(s) (manufacturer name not available)
- Total nominal power: 110 kW
- Operational
- Onshore wind farm
Part #3:
- Commissioning: 2008
- 9 turbine(s) Enercon E70/E4 (power 2000 kW, diameter 70 m)
- Total nominal power: 20,700 kW
- Operational
- Onshore wind farm
Part #4:
- Commissioning: 2007
- 5 turbine(s) Enercon E70/E4 (power 2000 kW, diameter 70 m)
- Total nominal power: 11,500 kW
- Operational
- Onshore wind farm
Part #5:
- Commissioning: 1993/07
- 1 turbine(s) (manufacturer name not available)
- Total nominal power: 150 kW
- Operational
- Onshore wind farm