Ense windfarm (Germany)
[Back to previous page]
Generalities
- Wind farm name: Ense
- Country: Germany
- County / Zone: Nordrhein-Westfalen
- Total power: 24 MW
- Estimated annual production: 60 GW.h (for an equivalent of 2,500 hours of full load/year)
Details
Part #1:
- 24 turbine(s) Enercon E40/500 (power 500 kW, diameter 40 m)
- Total nominal power: 12,000 kW
- Operational
- Onshore wind farm
Part #2:
- 5 turbine(s) Wind World
- Total nominal power: 3,000 kW
- Operational
- Onshore wind farm
Part #3:
- Commissioning: 1991/07
- 1 turbine(s) (manufacturer name not available)
- Total nominal power: 175 kW
- Operational
- Onshore wind farm
Part #4:
- Commissioning: 1994
- 4 turbine(s) Nordex N27/150 (power 150 kW, diameter 27 m)
- Total nominal power: 600 kW
- Operational
- Onshore wind farm
Part #5:
- Commissioning: 1994/02
- 1 turbine(s) Nordex
- Total nominal power: 200 kW
- Operational
- Onshore wind farm
Part #6:
- Commissioning: 2007
- 3 turbine(s) Enercon E53/800 (power 800 kW, diameter 52.9 m)
- Total nominal power: 2,400 kW
- Operational
- Onshore wind farm
Part #7:
- Commissioning: 2008/04
- 3 turbine(s) Enercon E70/2000 (power 2000 kW, diameter 70 m)
- Total nominal power: 6,000 kW
- Operational
- Onshore wind farm
Update for this sheet: 09/2010
Complete/correct this sheet: contact page