Förderstedt windfarm (Germany)
[Back to previous page]
Generalities
- Wind farm name: Förderstedt
- Country: Germany
- County / Zone: Sachsen-Anhalt
- Total power: 84 MW
- Estimated annual production: 209 GW.h (for an equivalent of 2,500 hours of full load/year)
Details
Part #1:
- Commissioning: 2005
- 2 turbine(s) (manufacturer name not available)
- Total nominal power: 4,000 kW
- Operational
- Onshore wind farm
Part #2:
- Commissioning: 2006
- 9 turbine(s) (manufacturer name not available)
- Total nominal power: 18,000 kW
- Operational
- Onshore wind farm
Part #3:
- Commissioning: 2007
- 7 turbine(s) (manufacturer name not available)
- Total nominal power: 14,000 kW
- Operational
- Onshore wind farm
Part #4:
- Commissioning: 2009
- 9 turbine(s) (manufacturer name not available)
- Total nominal power: 27,000 kW
- Operational
- Onshore wind farm
Part #5:
- Commissioning: 2009
- 6 turbine(s) (manufacturer name not available)
- Total nominal power: 6,900 kW
- Operational
- Onshore wind farm
Part #6:
- Commissioning: 2009
- 7 turbine(s) (manufacturer name not available)
- Total nominal power: 14,000 kW
- Operational
- Onshore wind farm
Update for this sheet: 12/2011
Complete/correct this sheet: contact page