Krauschwitz/Teuchern windfarm (Germany)
[Back to previous page]
Generalities
- Wind farm name: Krauschwitz/Teuchern
- Country: Germany
- County / Zone: Sachsen
- Total power: 23 MW
- Estimated annual production: 57 GW.h (for an equivalent of 2,500 hours of full load/year)
Details
Part #1:
- Commissioning: 2001
- 1 turbine(s) (manufacturer name not available)
- Total nominal power: 1,500 kW
- Operational
- Onshore wind farm
Part #2:
- Commissioning: 2002
- 5 turbine(s) (manufacturer name not available)
- Total nominal power: 7,500 kW
- Operational
- Onshore wind farm
Part #3:
- Commissioning: 2005
- 1 turbine(s) (manufacturer name not available)
- Total nominal power: 2,000 kW
- Operational
- Onshore wind farm
Part #4:
- Commissioning: 1999
- 7 turbine(s) (manufacturer name not available)
- Total nominal power: 10,500 kW
- Operational
- Onshore wind farm
Part #5:
- Commissioning: 2002
- 1 turbine(s) (manufacturer name not available)
- Total nominal power: 1,500 kW
- Operational
- Onshore wind farm
Update for this sheet: 02/2011
Complete/correct this sheet: contact page