Leitzersdorf windfarm (Austria)
[Back to previous page]
Generalities
- Wind farm name: Leitzersdorf
- Country: Austria
- County / Zone: Niederösterreich
- Total power: 4 MW
- Estimated annual production: 10 GW.h (for an equivalent of 2,500 hours of full load/year)
Details
- Commissioning: 1999/12
- 4 turbine(s) Bonus B52/1000 (power 1000 kW, diameter 52 m)
- Hub height: 60 m
- Total nominal power: 4,000 kW
- Operational
- Onshore wind farm
- Developed by: Ecowind GmbH
- Operator: R. Knopf GmbH
Update for this sheet: 01/2011
Complete/correct this sheet: contact page