Wind power and windfarms database
Eoltech

English English Deutsch Español


Eoltech

Online access > Wind farms > Messingen (Germany)


[Back to previous page]

Generalities

PDF

Details



Part #1:

  • City: Messingen, Brümsel
  • Commissioning: 2004/04
  • 1 turbine: (manufacturer name not available)
  • Total nominal power: 1,800 kW
  • Operational
  • Onshore wind farm
  • Operator: RWE
  • Owner: RWE

       Production forecast

  • From Friday, July 01 2016, 02:00 UTC, for the coming 24 hours:
  • Expected load rate: 48.2 %
  • Expected production: 20,810 kWh
  • Values from Climpact-Metnext Windcaster solution

Part #2:

  • City: Messingen, Brümsel
  • Commissioning: 2003/07
  • 2 turbines: (manufacturer name not available)
  • Total nominal power: 3,600 kW
  • Operational
  • Onshore wind farm
  • Operator: RWE
  • Owner: RWE

       Production forecast

  • From Friday, July 01 2016, 02:00 UTC, for the coming 24 hours:
  • Expected load rate: 45.8 %
  • Expected production: 39,580 kWh
  • Values from Climpact-Metnext Windcaster solution

Localisation



Part #1:

  • Latitude: 52° 26' 42"
  • Longitude: 7° 27' 6"
  • Geodetic system: WGS84
  • Precise localization: no

Part #2:

  • Latitude: 52° 26' 42"
  • Longitude: 7° 27' 6"
  • Geodetic system: WGS84
  • Precise location: yes
  • Google Maps view

Global map




Satellite view




Pictures



No photos for this wind farm.

Update for this sheet: 02/2016
Complete/correct this sheet:


www.thewindpower.net - 2005-2016 - all rights reserved - contact - partners - advertising