Metelen windfarm (Germany)
[Back to previous page]
Generalities
- Wind farm name: Metelen
- Country: Germany
- County / Zone: Nordrhein-Westfalen
- Total power: 10 MW
- Estimated annual production: 25 GW.h (for an equivalent of 2,500 hours of full load/year)
Details
Part #1:
- Commissioning: 1995/03
- 1 turbine(s) (manufacturer name not available)
- Total nominal power: 500 kW
- Operational
- Onshore wind farm
Part #2:
- Commissioning: 2003/12
- 1 turbine(s) (manufacturer name not available)
- Total nominal power: 1,200 kW
- Operational
- Onshore wind farm
Part #3:
- Commissioning: 2009/10
- 1 turbine(s) Enercon
- Total nominal power: 2,000 kW
- Operational
- Onshore wind farm
Part #4:
- Commissioning: 2002/04
- 1 turbine(s) (manufacturer name not available)
- Total nominal power: 600 kW
- Operational
- Onshore wind farm
Part #5:
- Commissioning: 2009/11
- 2 turbine(s) Enercon
- Total nominal power: 4,000 kW
- Operational
- Onshore wind farm
Part #6:
- Commissioning: 2004/09
- 1 turbine(s) (manufacturer name not available)
- Total nominal power: 1,800 kW
- Operational
- Onshore wind farm
Update for this sheet: 02/2011
Complete/correct this sheet: contact page