The Wind Power is a comprehensive database of detailed raw statistics on the rapidly growing sphere of wind energy and its supporting markets. The Wind Power is a comprehensive database of detailed raw statistics on the rapidly growing sphere of wind energy and its supporting markets.
English English Deutsch Español 

Online access > Wind farms > High Hedley Hope (United-Kingdom)


Sign up    Log in    Search

[Back to previous page]

United-Kingdom wind farms file

 

General data

  Map  

Generalities

Details


Part #1:

  • City: Tow Law
  • Commissioning:
  • 3 turbines: Nordex N52/800 (power 800 kW, diameter 52 m)
  • Hub height:
  • Total nominal power: 2,400 kW
  • Operational
  • Onshore wind farm
  • Developer: EDF renewables
  • Operator: EDF renewables
  • Owner:

Part #2:

  • Part: Extension
  • City: Tow Law
  • Commissioning:
  • 4 turbines: Nordex N60/1300 (power 1 300 kW, diameter 60 m)
  • Hub height:
  • Total nominal power: 5,200 kW
  • Operational
  • Onshore wind farm
  • Developer: EDF renewables
  • Operator: EDF renewables
  • Owner:
  • Source: Reserved for Premium Access

Localisation


Part #1:

  • Latitude: 54° 45' 38.8"
  • Longitude: -1° 46' 51.8"
  • Geodetic system: WGS84
  • Precise location: yes
  • Google Maps view

Part #2:

  • Part: Extension
  • Latitude: 54° 45' 56.3"
  • Longitude: -1° 45' 20.6"
  • Geodetic system: WGS84
  • Precise location: yes
  • Google Maps view


Update for this sheet: 3 August 2023
Complete/correct this sheet:



The Wind Power
contact@thewindpower.net
All rights reserved - 2005-2024 - Cookie Policy
Conditions of Use and Sale - Partners