Wind power and windfarms database
Greensolver

English English Deutsch Español


Eoltech

Online access > Wind farms > Münster (Germany)


[Back to previous page]

Generalities

PDF

Details


Part #1:

  • 7 turbines: (manufacturer name not available)
  • Total nominal power: 4,200 kW
  • Operational
  • Onshore wind farm

       Production forecast

  • From Sunday, December 11 2016, 01:00 UTC, for the coming 24 hours:
  • Expected load rate: 32.8 %
  • Expected production: 33,040 kWh
  • Values from Climpact-Metnext Windcaster solution

Part #2:

  • Commissioning: 2003
  • 3 turbines: (manufacturer name not available)
  • Total nominal power: 4,500 kW
  • Operational
  • Onshore wind farm

       Production forecast

  • From Sunday, December 11 2016, 01:00 UTC, for the coming 24 hours:
  • Expected load rate: 32.8 %
  • Expected production: 35,400 kWh
  • Values from Climpact-Metnext Windcaster solution

Localisation


Part #1:

  • Latitude: 51° 57' 52.9"
  • Longitude: 7° 37' 42.5"
  • Geodetic system: WGS84
  • Precise localization: no

Part #2:

  • Latitude: 51° 57' 52.9"
  • Longitude: 7° 37' 42.5"
  • Geodetic system: WGS84
  • Precise localization: no

Global map



Pictures


No photos for this wind farm.

Update for this sheet: 07/2015
Complete/correct this sheet:


www.thewindpower.net - 2005-2016 - all rights reserved - contact - partners - advertising