Sehnde windfarm (Germany)
[Back to previous page]
Generalities
- Wind farm name: Sehnde
- Country: Germany
- County / Zone: Niedersachsen
- Total power: 35 MW
- Estimated annual production: 88 GW.h (for an equivalent of 2,500 hours of full load/year)
Details
Part #1:
- Commissioning: 1997
- 3 turbine(s) (manufacturer name not available)
- Total nominal power: 1,500 kW
- Operational
- Onshore wind farm
Part #2:
- Commissioning: 2009
- 6 turbine(s) (manufacturer name not available)
- Total nominal power: 12,000 kW
- Operational
- Onshore wind farm
Part #3:
- Commissioning: 2002
- 5 turbine(s) (manufacturer name not available)
- Total nominal power: 7,500 kW
- Operational
- Onshore wind farm
Part #4:
- City: Sehnde, Lehrte
- Commissioning: 2005/06
- 5 turbine(s) Gamesa G80/2000 (power 2000 kW, diameter 80 m)
- Total nominal power: 10,000 kW
- Operational
- Onshore wind farm
Part #5:
- Commissioning: 2000/10
- 2 turbine(s) (manufacturer name not available)
- Total nominal power: 3,000 kW
- Operational
- Onshore wind farm
Part #6:
- Commissioning: 2006
- 1 turbine(s) (manufacturer name not available)
- Total nominal power: 800 kW
- Operational
- Onshore wind farm
Part #7:
- Commissioning: 1996/04
- 1 turbine(s) (manufacturer name not available)
- Total nominal power: 500 kW
- Operational
- Onshore wind farm
Update for this sheet: 05/2012