Wind power and windfarms database
Greensolver

English English Deutsch Espa˝ol


Eoltech

Online access > Wind farms > Spreetal (Germany)


[Back to previous page]

Generalities

PDF

Details


Part #1:

  • Commissioning: 2002
  • 5 turbines: (manufacturer name not available)
  • Total nominal power: 10,000 kW
  • Operational
  • Onshore wind farm

       Production forecast

  • From Sunday, December 04 2016, 01:00 UTC, for the coming 24 hours:
  • Expected load rate: 0.6 %
  • Expected production: 1,450 kWh
  • Values from Climpact-Metnext Windcaster solution

Part #2:

  • Commissioning: 2004
  • 3 turbines: (manufacturer name not available)
  • Total nominal power: 6,000 kW
  • Operational
  • Onshore wind farm

       Production forecast

  • From Sunday, December 04 2016, 01:00 UTC, for the coming 24 hours:
  • Expected load rate: 0.7 %
  • Expected production: 1,020 kWh
  • Values from Climpact-Metnext Windcaster solution

Part #3:

  • Commissioning: 2009
  • 1 turbine: (manufacturer name not available)
  • Total nominal power: 2,000 kW
  • Operational
  • Onshore wind farm

       Production forecast

  • From Sunday, December 04 2016, 01:00 UTC, for the coming 24 hours:
  • Expected load rate: 0.7 %
  • Expected production: 340 kWh
  • Values from Climpact-Metnext Windcaster solution

Localisation


Part #1:

  • Latitude: 51░ 29' 26.8"
  • Longitude: 14░ 22' 17.3"
  • Geodetic system: WGS84
  • Precise localization: no

Part #2:

  • Latitude: 51░ 29' 26.8"
  • Longitude: 14░ 22' 17.3"
  • Geodetic system: WGS84
  • Precise localization: no

Part #3:

  • Latitude: 51░ 29' 26.8"
  • Longitude: 14░ 22' 17.3"
  • Geodetic system: WGS84
  • Precise localization: no

Global map



Pictures


No photos for this wind farm.

Update for this sheet: /
Complete/correct this sheet:


www.thewindpower.net - 2005-2016 - all rights reserved - contact - partners - advertising