Arnstedt windfarm (Germany)
[Back to previous page]
Generalities
- Wind farm name: Arnstedt
- Country: Germany
- County / Zone: Sachsen-Anhalt
- Total power: 14 MW
- Estimated annual production: 35 GW.h (for an equivalent of 2,500 hours of full load/year)
Details
Part #1:
- Commissioning: 2001
- 5 turbine(s) (manufacturer name not available)
- Total nominal power: 5,000 kW
- Operational
- Onshore wind farm
Part #2:
- Commissioning: 2009
- 1 turbine(s) (manufacturer name not available)
- Total nominal power: 800 kW
- Operational
- Onshore wind farm
Part #3:
- Commissioning: 2000/01
- 1 turbine(s) (manufacturer name not available)
- Total nominal power: 500 kW
- Operational
- Onshore wind farm
- Owner: Falck Renewables
Part #4:
- Commissioning: 2009
- 4 turbine(s) (manufacturer name not available)
- Total nominal power: 8,000 kW
- Operational
- Onshore wind farm
- Owner: Falck Renewables
Update for this sheet: 01/2011
Complete/correct this sheet: contact page