Vollstedt windfarm (Germany)
[Back to previous page]
Generalities
- Wind farm name: Vollstedt
- Country: Germany
- County / Zone: Schleswig-Holstein
- Total power: 29 MW
- Estimated annual production: 72 GW.h (for an equivalent of 2,500 hours of full load/year)
Details
Part #1:
- City: Vollstedt
- 6 turbine(s) Nordex
- Total nominal power: 10,800 kW
- Operational
- Onshore wind farm
Part #2:
- City: Vollstedt
- Commissioning: 2003
- 1 turbine(s) Repower MD70 (power 1500 kW, diameter 70 m)
- Hub height: 65 m
- Total nominal power: 2,000 kW
- Operational
- Onshore wind farm
Part #3:
- City: Vollstedt
- Commissioning: 2003
- 3 turbine(s) Repower MM70 (power 2000 kW, diameter 70 m)
- Hub height: 65 m
- Total nominal power: 4,500 kW
- Operational
- Onshore wind farm
Part #4:
- City: Vollstedt
- 3 turbine(s) (manufacturer name not available)
- Total nominal power: 9,200 kW
- Operational
- Onshore wind farm
Part #5:
- City: Vollstedt
- Commissioning: 1997/05
- 1 turbine(s) (manufacturer name not available)
- Total nominal power: 500 kW
- Operational
- Onshore wind farm
Part #6:
- City: Vollstedt
- Commissioning: 2004/07
- 1 turbine(s) (manufacturer name not available)
- Total nominal power: 1,800 kW
- Operational
- Onshore wind farm
Update for this sheet: 12/2010
Complete/correct this sheet: contact page