Hafoty Ucha windfarm (United-Kingdom)
[Back to previous page]
Generalities
- Wind farm name: Hafoty Ucha
- Country: United-Kingdom
- County / Zone: Gwynedd
- Total power: 3 MW
- Estimated annual production: 7 GW.h (for an equivalent of 2,500 hours of full load/year)
Details
Part #1:
- Part: Hafoty Ucha I
- Commissioning: 1998/09
- 1 turbine(s) Vestas V44/600 (power 600 kW, diameter 44 m)
- Hub height: 39 m
- Total nominal power: 600 kW
- Operational
- Onshore wind farm
- Developed by: Tegni
- Operator: Tegni
- Owner: Falck Renewables
Part #2:
- Part: Hafoty Ucha II
- Commissioning: 2002/12
- 2 turbine(s) Vestas V52/850 (power 850 kW, diameter 52 m)
- Hub height: 44 m
- Total nominal power: 1,700 kW
- Operational
- Onshore wind farm
- Developed by: Tegni
- Operator: Tegni
- Owner: Falck Renewables
Part #3:
- Part: Hafoty Ucha III
- Commissioning: 2006/01
- 1 turbine(s) Vestas V52/850 (power 850 kW, diameter 52 m)
- Hub height: 44 m
- Total nominal power: 850 kW
- Operational
- Onshore wind farm
- Developed by: Tegni
- Owner: Falck Renewables
Update for this sheet: 08/2011