Rotor Elektrik Uretim Osmaniye windfarm (Turkey)
[Back to previous page]
Generalities
- Wind farm name: Rotor Elektrik Uretim Osmaniye
- Country: Turkey
- Total power: 135 MW
- Estimated annual production: 337 GW.h (for an equivalent of 2,500 hours of full load/year)
Details
- City: Osmanije
- Commissioning: 2009/06
- 54 turbine(s) GE 2.5xl (power 2500 kW, diameter 100 m)
- Total nominal power: 135,000 kW
- Operational
- Onshore wind farm
- Developed by: Rotor Elektrik
- Operator: Rotor Elektrik
Update for this sheet: 11/2010
Complete/correct this sheet: contact page