Soundarapandiapuram windfarm (India)
[Back to previous page]
Generalities
- Wind farm name: Soundarapandiapuram
- Country: India
- County / Zone: Tamil Nadu
- Total power: 6 MW
- Estimated annual production: 14 GW.h (for an equivalent of 2,500 hours of full load/year)
Details
Part #1:
- Commissioning: 2008
- 2 turbine(s) Vestas V82/1650 (power 1650 kW, diameter 82 m)
- Total nominal power: 3,300 kW
- Operational
- Onshore wind farm
- Developed by: Patspin India
Part #2:
- Commissioning: 2008
- 2 turbine(s) Suzlon S66/1250 (power 1250 kW, diameter 66 m)
- Total nominal power: 2,500 kW
- Operational
- Onshore wind farm
- Developed by: Patspin India
Update for this sheet: 03/2012
Complete/correct this sheet: contact page