Milford Wind Corridor, Phase II windfarm (USA)
[Back to previous page]
Generalities
- Wind farm name: Milford Wind Corridor, Phase II
- Country: USA
- County / Zone: Utah
- Total power: 102 MW
- Estimated annual production: 255 GW.h (for an equivalent of 2,500 hours of full load/year)
Details
- Part: ND
- City: Millard County
- Commissioning: 2011/05
- 68 turbine(s) GE 1.5sle (power 1500 kW, diameter 77 m)
- Total nominal power: 102,000 kW
- Operational
- Onshore wind farm
- Developed by: First Wind
- Operator: First Wind
- Owner: First Wind
Update for this sheet: 05/2012
Complete/correct this sheet: contact page