G24I windfarm (United-Kingdom)
[Back to previous page]
Generalities
- Wind farm name: G24I
- Country: United-Kingdom
- County / Zone: Wales
- Total power: 2 MW
- Estimated annual production: 5 GW.h (for an equivalent of 2,500 hours of full load/year)
Details
- City: Cardiff
- Commissioning: 2011/02
- 1 turbine(s) Enercon E82/2300 (power 2300 kW, diameter 82 m)
- Hub height: 79 m
- Total nominal power: 2,300 kW
- Operational
- Onshore wind farm
- Developed by: Ecotricity
- Operator: Ecotricity
- Owner: Ecotricity
Update for this sheet: 03/2012
Complete/correct this sheet: contact page